Machine shop · Source-backed profile
Rock Valley Tool LLC
- Processes
- 3
- Materials
- 1
- Industries
- 2
- Evidence checked
- 11
Rock Valley Tool LLC shop details
- Address
- 54 Oneil St, Easthampton, MA, 01027
- Phone
- +14135272350
- Location
- Easthampton, Massachusetts
- Hours
- Not reported in the current source data
- Source checked
- 2026-09-17
Capabilities are explicit statements found on the official website, not guarantees of current capacity, availability, certifications, or pricing. How this data works.
Capabilities
Explicit claims from the shop’s official website.
Open a source only when you need to verify a claim.
Processes
3Sources (3)
turning source ↗ · 2026-09-17
“AS/EN/JISQ9100:2009 (Rev C) and ISO 9001:2008 | Specializing in Aerospace, Blowmolding, Milling and Turning.”
milling source ↗ · 2026-09-17
“AS/EN/JISQ9100:2009 (Rev C) and ISO 9001:2008 | Specializing in Aerospace, Blowmolding, Milling and Turning.”
grinding source ↗ · 2026-09-17
“In addition to Rock Valley’s capabilities in turning, milling and grinding, the company works with several other local companies that offer specialty processes and additional certifications.”
Materials
1Sources (1)
plastics source ↗ · 2026-09-17
“Bill and his son ran the company primarily servicing the plastic extrusion blow-molding industry.”
Industries
2Sources (2)
aerospace source ↗ · 2026-09-17
“AS/EN/JISQ9100:2009 (Rev C) and ISO 9001:2008 | Specializing in Aerospace, Blowmolding, Milling and Turning.”
medical source ↗ · 2026-09-17
“Since his departure, Rock Valley Tool has expanded into several other industries including, but not limited to commercial/industrial, medical, firearms, aerospace; all while continuing to serve several customers in the plastics industry.”
Order types
2Sources (2)
prototype source ↗ · 2026-09-17
“Q7 1st Article Inspection If called out on the P.O., a 1st article is required for prototype and first production run Q8 Shelf Life Procedure It is the supplier’s responsibility to identify and verify articles, components and/or material being capable of quality degradation with ”
production source ↗ · 2026-09-17
“Q7 1st Article Inspection If called out on the P.O., a 1st article is required for prototype and first production run Q8 Shelf Life Procedure It is the supplier’s responsibility to identify and verify articles, components and/or material being capable of quality degradation with ”
Certifications claimed
3Sources (3)
ISO 9001 source ↗ · 2026-09-17 · self-reported
“Rock Valley Tool, LLC is committed to ensuring total customer satisfaction by continually improving our manufacturing processes and quality systems in compliance with ISO9001 and AS9100..”
AS9100 source ↗ · 2026-09-17 · self-reported
“Rock Valley Tool, LLC is committed to ensuring total customer satisfaction by continually improving our manufacturing processes and quality systems in compliance with ISO9001 and AS9100..”
ITAR source ↗ · 2026-09-17 · self-reported
“Thank you for your time and interest, Rock Valley Tool Management AS/EN/JISQ9100:2009 (Rev D) and ISO 9001:2015 ITAR Registered Certified Women-Owned Business Board Member of Western Mass NTMA Member of Greater Easthampton Chamber of Commerce Company President/Owner Elizabeth Paq”
More machine shops in Massachusetts and Easthampton.
Report a correction